Skip to content

CMMS — Maintenance module

CMMS built into the ERP: equipment, work orders, spare parts and invoicing

The AVIA ERP Maintenance module manages the equipment fleet, preventive and corrective work orders, spare parts and their cost — on the same data as production, inventory and invoicing.

Hierarchical equipment fleet

CMMS — Maintenance module

Parent and child equipment tree, criticality, status (operational, under maintenance, broken down, decommissioned), manufacturer, model, serial number, warranty, last and next maintenance dates.

Status
Available
Module
CMMS

What links maintenance to the rest

  • Parts leave real stock, with movements and lots
  • Overdue maintenance can block an operation from starting
  • A work order can be proposed for invoicing

Short answer

A CMMS is maintenance management software: it holds the equipment fleet, schedules preventive work, and tracks corrective work orders, spare parts and their cost. In AVIA ERP it is not software beside the ERP but a module of the same foundation: consumed parts leave real stock, overdue maintenance can block an operation from starting on the workstation concerned, and a work order can be proposed for invoicing. The module is included from the Professionnel pack.

What the Maintenance module does

Every capability below exists in the product. Those whose scope is narrower than their name suggests are marked “Partial” and explained.

  • Available

    Hierarchical equipment fleet

    Parent and child equipment tree, criticality, status (operational, under maintenance, broken down, decommissioned), manufacturer, model, serial number, warranty, last and next maintenance dates. Technical locations are managed separately.

  • Available

    Preventive and corrective work orders

    Automatic numbering, priority, assigned technician, links to a project or an after-sales ticket, start and close, printable work order sheet (problem, solution, parts, labour, machine downtime). Closing updates the equipment’s last maintenance date; a declared breakdown feeds its breakdown and downtime-hours counters.

  • Available

    Preventive calendar and triggering

    Due dates per equipment or workstation, in days, weeks or months, or by meter (hours, cycles, kilometres, units) from readings entered on the equipment sheet, with a checklist stored in the plan. When a plan falls due, the preventive work order is created by a scheduled server job, or on demand with “Generate due preventive orders”: one order per plan and per due date, and the next due date restarts from the closing of the order.

  • Available

    Checklist on the work order sheet

    The plan’s checklist points are copied into the generated work order. Each one is handled on the sheet: done, non-compliant or not applicable, with a comment; the author and time are set by the server. While a point remains to be done, the preventive closing rule warns or refuses, depending on the mode the consultant chose.

  • Available

    Spare parts on real stock

    Parts attached to each equipment, required quantity. From the work order, issuing creates a consumption voucher with a stock movement and lots; removing a part credits the stock back.

  • Partial

    Work order invoicing proposal

    The customer is found through the ticket, the project or the contract; hours are valued at the maintenance billing rate, parts at sales price, and the contract coverage is deducted. A contract’s yearly cap on work orders is not applied.

  • Available

    Overdue maintenance: production blocked

    A configurable business rule refuses to start an operation on a workstation whose maintenance is overdue, with a clear message. It is the same rule engine as approvals and quality controls.

  • Available

    Technician planning and response time

    A planning board per technician, by week or month: drag a work order to a technician and a day, and the server validates the assignment. A service contract carries a response time, tracked on each work order.

  • Partial

    Reliability indicators and breakdown Pareto

    Preventive rate, overdue plans, MTBF and MTTR, then a breakdown Pareto (count, share, cumulative and downtime hours) by failure code, by equipment or by month, with a cost tab. The failure, its cause and its remedy are coded when a corrective work order is closed. MTBF and MTTR are computed from the recorded work orders, not from measured running hours: an MTBF needs at least two closed, dated breakdowns on the same equipment.

The module in screenshots

Three portal screens: the breakdown Pareto, the preventive calendar and the work orders.

Screenshots of the portal on a fictitious demonstration company, on a local test bench: the names and figures shown are sample data.

  • Maintenance › CMMS KPIs › Failure Pareto
    Failure Pareto tab: grouping by failure code, equipment or month over a period, tiles for failures and total downtime, then a histogram of failures in descending order with the cumulative percentage curve.
    Closed breakdowns ranked by code with the cumulative percentage: you see which code weighs most.
  • Maintenance › Preventive (Calendar)
    Preventive calendar for August 2026: tiles for active schedules, late, next seven days and equipment, a monthly grid with four maintenance plan due dates, New plan and Generate due preventive orders buttons, then the list of late maintenance.
    The due dates of maintenance plans per equipment; the “Generate due preventive orders” button creates the orders that are due.
  • Interventions
    Work order list: tiles for total, in progress, completed and critical, Preventive, Corrective and Improvement tabs, then a table of numbers, titles, categories, priorities, statuses and dates.
    All work orders, preventive and corrective, with their status; the sheet opens with one click.

What the module does not do

Better to read it here than at commissioning. These points decide whether the module is enough or needs to be complemented.

  • No dedicated maintenance mobile app and no equipment QR code: the portal is used as is.
  • In the Maintenance module, downtime is accumulated in hours per closed work order: there is no time-stamped downtime log.
  • MTBF and MTTR rely on the recorded work orders, not on measured running hours; the availability shown follows from them.
  • No predictive maintenance: only the due dates you define, by date or by meter, trigger an order.

How it is deployed

The Maintenance module is included from the Professionnel pack (deployment in 2 to 4 weeks) and in the Enterprise pack (6 to 12 weeks); it is not in Essentiel. It builds on the inventory, workstations and customers already in place in the ERP.

Frequently asked questions

What is a CMMS?

A CMMS is computerised maintenance management software. It lists the equipment, schedules preventive maintenance, and tracks corrective work orders, spare parts and costs.

Is the AVIA CMMS separate software from the ERP?

No, it is the Maintenance module of the same foundation. It shares inventory, workstations, customers and invoicing. The guide “CMMS or built-in maintenance module” details when a built-in module is enough and when a dedicated CMMS is justified.

Are preventive maintenance orders created automatically?

Yes. At each due date, dated or reached by a meter, a scheduled server job creates the plan’s preventive work order with its checklist, without duplicates: one order per plan and per due date. The calendar’s “Generate due preventive orders” button does the same on demand. There is no predictive maintenance: only the due dates you define trigger an order.

Does the module compute MTBF, MTTR and a breakdown Pareto?

Yes, from the recorded work orders. The Pareto ranks closed breakdowns by failure code, by equipment or by month, with the cumulative share and downtime hours. An MTBF needs at least two closed, dated breakdowns on the same equipment; these indicators are not based on measured running hours.

Do spare parts leave real stock?

Yes. Issuing from a work order creates a consumption voucher with a stock movement and lots, and removing a part puts the quantity back into stock.

Which pack includes the Maintenance module?

The Professionnel and Enterprise packs, not Essentiel. Deployment takes 2 to 4 weeks for Professionnel and 6 to 12 weeks for Enterprise.

Let’s look at your maintenance on a real case. Forty-five minutes, one real process, a written summary.

Book an industrial diagnostic