Skip to content

ERP for electronics manufacturing and board assembly

Multi-level bills of material with substitute components, component batches tracked through to the work order, supplier certificates per item: the ERP of an electronics subcontractor.

ERP for electronics manufacturing and board assembly

Electronics

  • Bills of material and substitute components
  • Component batches and traceability
  • Supplier certificates per item

Hundreds of part numbers for one board

A board of average complexity draws on several hundred part numbers, many of them worth a matter of pennies and a handful of them deciding the lead time. The difficulty is not the value of the stock, it is that a single missing line holds up the whole build.

Obsolescence adds to this: a component declared end of life forces you to qualify an alternate, document the equivalence and run down existing stock without mixing versions. A spreadsheet of equivalences ages badly.

Lastly, components are delivered on reels in imposed quantities. What remains on a part-used reel is production data as much as stock data, and it is lost very quickly unless it is tracked reel by reel.

Hundreds of part numbers for one board
Moisture, acceptability and component compliance

Moisture, acceptability and component compliance

Moisture-sensitive packages carry an MSL level that limits their exposure time outside dry packaging. Exceeding that time invites delamination at reflow, a defect invisible to visual inspection that will surface at the customer.

Assembly acceptability falls under IPC-A-610 for boards and IPC/WHMA-A-620 for cable and wire harness, with classes that change according to the field of application. RoHS and REACH compliance is demonstrated at component level.

AVIA ERP holds multi-level bills of material with their substitute components, tracks component batches through to the work order that consumes them and attaches supplier certificates to the item. AVIA does not track the exposure time of moisture-sensitive components or obsolescence; the RoHS/REACH certification flag stays on the supplier, with no consolidation at product level.

What an electronics subcontractor expects from its ERP

  • Bills of material and substitute componentsMulti-level bills of material, alternate component declared on the line, lines carrying effectivity dates to switch between versions with no mixing.
  • Component batches and traceabilityComponent batches tracked from receipt to the work order that consumes them. Batch and serial traceability can be required by rule.
  • Supplier certificates per itemCertification recorded on the supplier record, certificates attached to the item; a rule flags an expired certificate.

The direct benefits for your industrial company

  • Equivalences out of the spreadsheet

    The alternate component is declared on the bill of material, instead of living in a spreadsheet of equivalences.

  • From component to board

    Batches and serial numbers link a component under question to the work orders concerned.

  • Certificates found again

    Supplier certificates are attached to the item and found without trawling mailboxes.

  • Dated bill of material versions

    Lines with effectivity dates avoid mixing two versions of a bill of material.

Get a personalised demonstration of our ERP!

Request your demo

They trust us

  • PSZ Cable

    Cable and harness manufacturing.

Industrial diagnostic: forty-five minutes, one real process, a written summary.

Book an industrial diagnostic