ERP for the aerospace industry

Traceability from the melt to the delivered part, control of special processes and first article inspection files: the ERP built for EN 9100 requirements and the long-term production rates of the sector.
Request a demo
ERP for the aerospace industry

Short runs, long files

You manufacture few parts, but each one must remain accountable ten years later. A customer investigating a non-conformance in 2035 will expect the ingot melt, the operator who drilled, the furnace that treated and the surface treatment certificate.

This documentary requirement is the sector's real cost, far more than the machining itself. Multi-year contracts with delivery call-offs, definition revisions that change mid-programme and raw material lead times of several months add to it.

A general-purpose ERP knows how to track a work order. It usually cannot tie a part to its material certificate, nor block a release because an operator's approval expired the day before.

Short runs, long files
Special processes, concessions and first article

Special processes, concessions and first article

Special processes — heat treatment, surface treatment, non-destructive testing, welding — are not verified on the finished part. Their conformity rests on the qualification of the process, the equipment and the operator, often under Nadcap accreditation.

The first article inspection file (FAI, AS9102 forms) governs the release of the production run. Every revision change partially reopens it. Kept in a spreadsheet, it becomes the leading cause of late delivery observed in audit.

AVIA ERP ties each operation to its qualification, refuses clocking by an unapproved operator, archives material certificates at batch level and keeps the full genealogy — from the melt to the shipped part — without re-entry.

What an aerospace workshop expects from its ERP

Full genealogy, melt to part

Upstream and downstream chaining from the EN 10204 material certificate to the delivered serial number. A non-conformance retrieves every part from the same melt in a single query.

The direct benefits for your industrial company

The audit stops being a project

The evidence an EN 9100 audit asks for is produced from the system rather than reconstructed. Preparation is counted in hours instead of weeks.

No release outside approval

The check is carried by the system at clocking time. An expired qualification stops the operation before the part, not after.

Commitments you can hold

Delivery call-offs matched against real load and material lead times give a delivery date you can defend in front of the customer.

Revision changes stop propagating errors

Each work order stays on its own definition. Scrap caused by mixed revisions disappears.

Get a personalised demonstration of our ERP!

Request your demo