Skip to content

ERP for precision engineering and subcontract machining

Setup time kept apart from run time on the routing, clocking by operation, inspection records tied to the batch, control charts and Cp / Cpk indices: the ERP for a workshop where margin is decided by the second of spindle time.

ERP for precision engineering and subcontract machining

Mechanical engineering

  • Routing costing and quotation
  • Shop floor clocking by operation
  • Versioned bill of materials and routing copied to the order

Unit cost is counted in seconds

A machining quotation is a bet on times. The routing states a theoretical time per operation, the workshop consumes a real time, and the gap between the two is most of the margin. That gap still has to be measured at the level where it arises: the operation, not the order.

Setup time is the more poorly handled of the two. It does not behave like run time: it is incurred once, whatever the number of parts. Underestimated on a batch of twenty parts, it wipes out the margin of the whole batch; on a long run it dilutes to the point of no longer being visible. Merging the two into an average time amounts to overcharging the long runs and losing money on the short ones, without ever knowing which is which.

To this is added the pressure of the response time. A tender is often decided in a few days, and the quotation is then rebuilt by hand, operation by operation: turning, milling, grinding, deburring, inspection. Quoting fast and quoting right remain at odds for as long as routings already run cannot be reused as a costing basis.

There remains what unit cost almost always ignores: cutting tool consumption. Inserts, drills and cutters have a life that depends on the material machined and on the cutting conditions. That spend is real, but it is rarely tied to the works order that caused it, and so absent from the cost of the part.

Unit cost is counted in seconds
Finding the right routing, and being able to prove it

Finding the right routing, and being able to prove it

The leading cause of scrap in subcontract machining is not the machine, it is the drawing. A part machined to a superseded revision conforms to the document the operator had in front of him and is rejected at goods inwards. The problem repeats itself years later: a repeat order has to find its routing, long after the departure of whoever prepared it. AVIA does not manage the drawing revision: it is kept in your document management, and the ERP keeps the routing and the versioned bill of materials.

Then comes what has to be inspected. General tolerances refer to ISO 2768, geometrical tolerancing to the GPS language and to ISO 1101: flatness, coaxiality, position, specified datums. These requirements are measured with instruments whose calibration carries a periodicity and a traceability chain, and an informed customer will ask for the inspection report before accepting the batch. On parts monitored under SPC, he will also expect usable measurement records and the Cp and Cpk capability indices that follow from them.

The third blind spot is subcontracted treatment. A part sent out for heat treatment or surface treatment leaves the workshop in the middle of its routing. The work in progress becomes invisible, the lead time depends on a third party, and the cost of the operation must nonetheless enter the margin of the part.

AVIA ERP copies the routing into the manufacturing order created from the sales order, so that work in progress keeps the routing it was released on, and keeps setup time apart from run time on the routing. Shop floor clocking compares labour and machine hours with the standard, treatments leave on a subcontracting order linked to the manufacturing order, and inspection records stay attached to the batch they qualify.

The mechanical workshop on screen

Four portal screens on a fictitious machine builder (sheet-metal work, welded fabrication): the routing with its setup times, a SMED study, OEE by workstation and the preventive calendar.

Portal screenshots on Thyna Machines Spéciales, a fictitious demonstration company, on a local test bench: the names, workstations and figures shown are sample data.

  • Production › Routings
    Routing of bill of materials MC-003: six operations (laser cutting, bending, MIG/MAG welding, painting and curing, mechanical assembly, test bench) with unit time, setup time and yield inherited from the workstation, and at the top the total unit time, total setup and planned duration.
    The routing of a machine: for each operation, the unit time and the setup time are entered separately.
  • Lean Management › SMED
    SMED study of a press brake: current time 52 minutes, target 25, achieved 26, before and after chart, then the changeover operations, internal or external.
    A SMED study of a tool changeover on a press brake: current, target and achieved time, before / after chart and changeover operations.
  • Quality › OEE
    OEE screen: overall efficiency, availability, performance and quality over 30 days, then a table by workstation (test bench, paint booth, welding cell, machining centre, wiring, laser cutting) with state, target, OEE and good parts / scrap.
    The OEE compared with the target, with availability, performance and quality, workstation by workstation, and good parts and scrap.
  • Maintenance › Preventive (calendar)
    Preventive calendar for August 2026: tiles for active schedules, overdue, next days and equipment, then a monthly calendar with the preventive plans of the laser cutter, the press brake, the lathe and the MIG station, and the list of overdue maintenance.
    The preventive maintenance calendar of the workshop machines, with overdue maintenance below.

What a machine shop expects from its ERP

  • Routing costing and quotationCosting of a manufacturing routing by workstation and hourly rate, which feeds the quotation and its revisions; setup time is entered separately on the production routing.
  • Shop floor clocking by operationClocking by operation with labour and machine hours, compared with standard times; setup and run distinguished in the planned times of the routing. Machine variance and variance by order in the cost analysis.
  • Versioned bill of materials and routing copied to the orderBill of materials with a version and a status, routing copied into the manufacturing order: work in progress keeps the routing it was released on. Inspection plan tied to the operation.
  • Dimensional inspection and control chartsMeasurement records entered against the order, the operation and the batch; control charts and Cp / Cpk capability indices computed by the server. The quality tracking sheet can be printed.
  • Subcontracted treatmentsSubcontracting orders linked to the manufacturing order, with quantities sent and received and rework; the subcontracting cost is carried into the cost analysis and the job status.
  • Measuring instruments and calibrationA register of measuring instruments with calibration history and due dates; an inspection that declares an instrument out of calibration can be refused (enableable rule).

The direct benefits for your industrial company

  • Setup is told apart from run time

    Kept apart in the planned times of the routing, it appears for what it is: a fixed cost per batch.

  • Replying fast with costing by workstation

    Costing breaks the routing down by workstation and hourly rate and feeds the quotation, with its revisions.

  • Work in progress keeps its routing

    The manufacturing order carries its own copy of the routing, frozen at release.

  • The inspection file follows the part

    Measurement records are attached to the batch; non-conformances are attached to the manufacturing order, the receipt or the inspection; the customer's request is met from the system.

Get a personalised demonstration of our ERP!

Request your demo

They trust us

  • AMM — Les Ateliers Micro-Mécanique

    Precision engineering.

Industrial diagnostic: forty-five minutes, one real process, a written summary.

Book an industrial diagnostic