Skip to content

Lean Six Sigma — Lean module

Lean Six Sigma in the ERP: SMED, 5S and Kaizen tied to your workstations

The AVIA ERP Lean module gives a tool for each approach — SMED study, 5S audit, improvement projects, improvement plan — and ties them to the ERP’s workstations, nonconformities and manufacturing orders.

SMED study

SMED study

Lean Six Sigma — Lean module

On a workstation chosen from the list of workstations, each operation is described, classed internal or external with its duration, then reclassed (internal, external or eliminated) with its target duration and the improvement action.

Status
Available
Module
Lean Six Sigma

The module’s tools

  • SMED study and series changeover checklist
  • 25-criterion 5S audit
  • Improvement projects (Kaizen, A3, Six Sigma) and improvement plan

Short answer

Lean aims to remove waste, Six Sigma to reduce variation: two methods for two problems. In AVIA ERP, the Lean module implements the first family — SMED study of series changeovers, 5S audit, Kaizen projects — and an improvement plan reads ERP data (manufacturing orders, SMED studies, 5S audits, nonconformities, OEE) to rank findings by severity. On the Six Sigma side, a DMAIC project carries five free-text areas (Define, Measure, Analyze, Improve, Control); measurement comes from the Quality module — X̄-R and I-MR control charts computed by the server, Cp, Cpk, Pp, Ppk, Western Electric rules — and cause analysis (successive whys, Ishikawa) and the 8D file are recorded in the nonconformity. The product computes neither a sigma level nor DPMO. The Lean module is included in the Enterprise pack.

What the module contains

Every tool exists in the product. Those whose scope is narrower than their name are marked “Partial” and explained.

  • Available

    SMED study

    On a workstation chosen from the list of workstations, each operation is described, classed internal or external with its duration, then reclassed (internal, external or eliminated) with its target duration and the improvement action. The screen computes the eliminated time, the internal time before and after, and the reduction between the current time and the achieved time.

  • Available

    5S audit

    Twenty-five criteria, five per S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke), scored 1 to 4 with comment, for an area typed as free text (the screen suggests areas already audited). Score per S and total score, radar per zone, compliant status or not, filterable list.

  • Available

    Improvement projects (Kaizen, A3, Six Sigma DMAIC)

    One sheet per project: type (Kaizen, Lean, Six Sigma, SMED, quality, safety), targeted process, priority, current and target value, estimated gain, target date. A Six Sigma (DMAIC) project carries five free-text areas — Define, Measure, Analyze, Improve, Control — and an A3 sheet four areas — Problem, Root cause, Countermeasure, Result. These are input fields, not a guided assistant.

  • Available

    Series changeover checklist

    A changeover preparation, attached to a planned or in-progress manufacturing order: five points marked OK or KO, with comment — safety, supply, staffing, equipment, documentation — and a validation date.

  • Available

    Company improvement plan

    It reads items, manufacturing orders, purchase requests, SMED studies, 5S audits, nonconformities, OEE, machine load and projects, then produces a maturity score and findings ranked by severity, with the link to the relevant screen and the associated method (Lean, Six Sigma, SMED, 5S).

  • Partial

    Six Sigma: measurement through Quality (SPC and capability)

    Measurement relies on the Quality module: X̄-R and I-MR control charts computed by the server, Cp, Cpk, Pp, Ppk and four Western Electric rules to spot signals; OEE per workstation, with machine stops by reason. For analysis, the nonconformity keeps its successive whys (seven at most, only one marked as root cause) and its six-family Ishikawa diagram, and an 8D file is required for a major or critical nonconformity. The product computes no sigma level or DPMO and has no quality Pareto chart: that is why the capability is marked partial.

  • Available

    Business rules for the quality approach

    Four rules, activated per company and simulable before activation: “Non-conformity / corrective action loop” (no next step without a root cause, a completed action and verified effectiveness), “Complete 8D file before closing a non-conformity”, “Recurring non-conformance” and “Excessive scrap rate”. The first two start in “observe” mode (the gap is logged and counted) and switch to “block” when you decide; the other two are set to “warn” or “block”, with no “observe” mode.

The product in screenshots

Six portal screens: measurement, cause analysis, projects, then the Lean tools.

Portal screenshots on a fictitious demonstration company, on a local test bench: names and figures shown are sample data.

  • Quality › Control charts
    Statistical process control screen: Cp, Cpk, Pp and Ppk tiles, mean and within-subgroup standard deviation, and an X̄ chart with centre line, control limits, specification limits and signal points circled in red.
    X̄ control chart of a manufacturing characteristic: Cp, Cpk, Pp and Ppk are computed by the server and points that break a Western Electric rule are flagged.
  • Quality › Non-Conformities › Cause analysis
    Cause analysis tab of a nonconformity: a numbered list of successive whys with one ticked as root cause, then an Ishikawa diagram in six families (Method, Machine, Manpower, Material, Measurement, Environment).
    The successive whys and the Ishikawa are entered in the nonconformity and saved with it; only one root cause is marked among the whys.
  • Lean System › Projects
    List of improvement projects with a Six Sigma (DMAIC) project expanded on its five text areas — Define, Measure, Analyze, Improve, Control — above the dates and estimated gain.
    An expanded Six Sigma project: five free-text areas, one per DMAIC phase, attached to the project sheet.
  • Lean System › 5S
    5S tab of Lean & continuous improvement: summary tiles, a five-axis radar (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) for a zone’s latest audit compared with the zones’ average and the 80% threshold, then one card per zone with its status.
    The 5S audit by zone: a radar over the five S, compared with the zones’ average and the compliance threshold.
  • Lean System › SMED
    SMED study on a press: current, target and achieved time, reduction, before and after bars split into internal, external and eliminated, then the table of changeover operations with type and duration before and after improvement.
    The SMED study of a workstation: each changeover operation is classed internal or external, before and after improvement.
  • Quality › OEE
    OEE screen, equipment effectiveness: Overall efficiency, Availability, Performance and Quality tiles, then a table by workstation with state, overall OEE, target and good and scrap parts.
    OEE per workstation, with availability, performance and quality; stops are broken down by reason.

What the module does not cover

To decide whether it is enough for your approach, here are the tools you will not find in it.

  • No value stream mapping (VSM): no screen is dedicated to it.
  • No Pareto chart as a quality tool. Stock ABC analysis and the maintenance breakdown Pareto exist, but they are different tools.
  • No TPM: maintenance is managed in the Maintenance module, without autonomous maintenance or operator checklists.
  • The manufacturing-order board by status is not a card-based replenishment kanban.
  • No sigma level or DPMO calculation.
  • The five DMAIC areas and the four A3 areas are free text: no assistant guides or checks the phases.

How it is deployed

The Lean module is included in the Enterprise pack (deployment in 6 to 12 weeks). OEE and SPC belong to the Quality module, present from the Professionnel pack (2 to 4 weeks). SMED studies build on the workstations already created in the ERP; the 5S audit is entered by area.

Frequently asked questions

What is the difference between Lean and Six Sigma?

Lean tackles waste and lead time; Six Sigma tackles variation and the dispersion of results. The guide “Lean or Six Sigma” helps work out which of the two problems you have before applying a remedy.

What is a SMED study in AVIA ERP?

A study tied to a workstation: each operation of a changeover is classed internal or external, with its current duration, its improved duration and the improvement action. The screen computes the eliminated time and the reduction between the current time and the achieved time.

How does the 5S audit work?

Twenty-five criteria, five per S, scored 1 to 4 with comment, for a score per S and a total score, per area (typed as free text, with suggestions of areas already audited).

Does the module compute a sigma level?

No. A Six Sigma (DMAIC) project has five free-text areas, and the Quality module provides OEE per workstation and control charts (X̄-R, I-MR) with Cp, Cpk, Pp, Ppk and Western Electric rules; it computes neither a sigma level nor DPMO.

Which pack includes the Lean module?

The Enterprise pack, whose deployment takes 6 to 12 weeks. OEE and SPC are in the Quality module, present from the Professionnel pack.

Let’s look at one of your changeovers or workstations. Forty-five minutes, one real process, a written summary.

Book an industrial diagnostic