Lean Six Sigma — Lean module
The AVIA ERP Lean module gives a tool for each approach — SMED study, 5S audit, Kaizen projects, improvement plan — and ties them to the ERP’s workstations, nonconformities and manufacturing orders.
AVIA ERP
Lean Six Sigma
SMED study
Lean Six Sigma — Lean module
On a workstation chosen from the list of workstations, each operation is described, classed internal or external with its duration, then reclassed (internal, external or eliminated) with its target duration and the improvement action.
The module’s tools
Lean aims to remove waste, Six Sigma to reduce variation: two methods for two problems. In AVIA ERP, the Lean module implements the first family — SMED study of series changeovers, 5S audit, Kaizen projects — and an improvement plan reads ERP data (manufacturing orders, SMED studies, 5S audits, nonconformities, OEE) to rank findings by severity. On the Six Sigma side, the product offers a DMAIC guide and, in the Quality module, OEE and statistical process control; it does not compute a sigma level. The Lean module is included in the Enterprise pack.
Every tool exists in the product. Those whose scope is narrower than their name are marked “Partial” and explained.
On a workstation chosen from the list of workstations, each operation is described, classed internal or external with its duration, then reclassed (internal, external or eliminated) with its target duration and the improvement action. The screen computes the eliminated time, the internal time before and after, and the reduction against the target.
A changeover preparation, attached to a planned or in-progress manufacturing order: five points marked OK or KO, with comment — safety, supply, staffing, equipment, documentation — and a validation date.
Twenty-five criteria, five per S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke), scored 1 to 4 with comment, on a workstation linked to the workstation list. Score per S and total score, compliant status or not, filterable list. An action plan is proposed by the AI from the poorly scored criteria.
One sheet per project: type (Kaizen, Lean, Six Sigma, SMED, quality, safety), targeted process, priority, current and target value, estimated gain, target date. A Kaizen board sorts projects into four columns by status.
It reads items, manufacturing orders, purchase requests, SMED studies, 5S audits, nonconformities, OEE, machine load and projects, then produces a maturity score and findings ranked by severity, with the link to the relevant screen and the associated method (Lean, Six Sigma, SMED, 5S).
The DMAIC tab is a guide to the five phases with their tasks, not editable: phases are not filled in on the screen. Measurement relies on the Quality module: OEE per workstation (availability, performance, quality) and SPC control charts with Cp and Cpk, reading existing measurements. No sigma level or DPMO calculation.
To decide whether it is enough for your approach, here are the tools you will not find in it.
The Lean module is included in the Enterprise pack (deployment in 6 to 12 weeks). OEE and SPC belong to the Quality module, present from the Professionnel pack (2 to 4 weeks). SMED studies and 5S audits build on the workstations already created in the ERP.
Two method guides to choose between Lean and Six Sigma and to cost a tooling changeover, a guide on quality audits, sectors where shop-floor discipline weighs, and neighbouring pages.

Production
10 min read

Production
9 min read
Standards
8 min read
Lean tackles waste and lead time; Six Sigma tackles variation and the dispersion of results. The guide “Lean or Six Sigma” helps work out which of the two problems you have before applying a remedy.
A study tied to a workstation: each operation of a changeover is classed internal or external, with its current duration, its improved duration and the improvement action. The screen computes the eliminated time and the reduction against the target.
Twenty-five criteria, five per S, scored 1 to 4 with comment, for a score per S and a total score. The lowest-scored criteria are the basis for an action plan proposed by the AI.
No. The product offers a DMAIC guide of the five phases, and the Quality module provides OEE per workstation and control charts with Cp and Cpk; it computes neither a sigma level nor DPMO.
The Enterprise pack, whose deployment takes 6 to 12 weeks. OEE and SPC are in the Quality module, present from the Professionnel pack.
Let’s look at one of your changeovers or workstations. Forty-five minutes, one real process, a written summary.
Book an industrial diagnostic