Skip to content

Production 10 min

Lean in AVIA: 5S, SMED, kaizen and OEE step by step, up to the rule that holds the discipline

Not one more course on Lean: which screen to open to audit your 5S, quantify a changeover, carry a kaizen on an A3 sheet and follow OEE per workstation — and which business rule to switch on to hold scrap. Portal screenshots, on a fictitious machine workshop.

Published on 1 November 2026

AVIA ERP editorial team
About
Lean in AVIA: 5S, SMED, kaizen and OEE step by step, up to the rule that holds the discipline
Contents

Short answer

In AVIA, Lean is practised on five screens: the 5S audit by area (80% compliance threshold), the suggestion box, the SMED study with its current, target and achieved times, kaizen projects with their four-zone A3 sheet, and OEE per workstation (Quality › OEE/TRS dashboard) with an adjustable target and alert threshold. To hold the discipline, the business rule “Excessive scrap rate” compares the declared scrap rate with the workstation's reference plus a margin, in warn or block mode, after a 90-day simulation.

Articles on Lean explain the tools. This one shows where each is practised in AVIA: which screen to open, which indicator to read, which business rule to switch on so that the discipline holds. The running example is a demonstration machine-building workshop (press brake, laser cutting, welding, wiring); every screenshot comes from the portal, on that fictitious company.

Before you start: three prerequisites

  • Your workstations declared (Production › Workstations): OEE is calculated workstation by workstation, and the target is set on the workstation record.
  • Operation confirmations and machine stops entered or received: stops are keyed in or arrive from a signal source linked by API key; this is what the server draws availability, performance and quality from. Without them, OEE shows “—”, not 0%.
  • The Lean module (Lean Management menu), which brings four tabs together on a single screen: 5S, Suggestions, SMED and Projects.

1. Sort, set in order, shine: the 5S audit by area, in the Lean Management menu, 5S tab

An audit covers an area (a workshop, a hall, a store). It consists of twenty-five criteria, five per “S” — Seiri, Seiton, Seiso, Seiketsu, Shitsuke — scored from 1 to 4. A comment is mandatory for a score of 2 or less. The score of each S and the total are calculated live; the total is the average of the five. From 80%, the area is “Compliant”; below, it becomes “Needs action”.

5S tab of Lean Management in AVIA: four indicators, Seiri, Seiton, Seiso, Seiketsu, Shitsuke radar of the Machine assembly workshop area, and cards of compliant or needs-action areas
Lean Management menu, 5S tab: one area below the 80% threshold (74%, “Needs action”), its radar against the average of areas, and two compliant areas.Capture of the AVIA portal on a fictitious demonstration company (local test bench): names, figures and dates are sample data. View full size

The screen gives the number of audited areas, the average score, the compliant areas and those that need actions. The radar shows the latest audit of the chosen area, with the average of areas and the threshold as dotted lines. Each audit keeps an “Action plan” field in free text: this is where you write what is decided, by whom and by when.

2. Capture ideas from the shop floor: the suggestion box

The Suggestions tab is a board with six columns: Submitted, Under evaluation, Accepted, Implemented, Closed, Rejected. A card moves forward in order; moving to evaluation requires nothing, but accepting requires impact and effort (from 1 to 5) and an owner — the deadline and the estimated gain stay optional —, rejecting a reason, closing the observed gain. The tiles at the top total the estimated gain of suggestions accepted or beyond, and the observed gain once closed.

Suggestions tab of Lean Management in AVIA: board with columns Submitted, Under evaluation, Accepted, Implemented, Closed, Rejected, with three suggestion cards
Lean Management menu, Suggestions tab: three workshop ideas at three stages of the workflow. The accepted card carries its impact, its effort and its estimated gain.Capture of the AVIA portal on a fictitious demonstration company (local test bench): names, figures and dates are sample data. View full size

Two safeguards come from the database, not from the screen. Whoever submits a suggestion cannot evaluate it or decide on it themselves: a second user moves it forward. And an accepted suggestion can be turned into a corrective action (the “Create a CAPA” button, which requires an owner and a deadline if the suggestion is linked to a non-conformity): the idea then enters the quality loop.

3. Shorten changeovers: the SMED study

The SMED tab keeps one study per changeover and per workstation: a current time, a target time and an achieved time, in whole minutes. The reduction is calculated by the database, and a bar shows progress towards the target. The status follows the study: Analysis, Implementation, Completed, Tracking. A panel recalls the four steps of the method — observe, separate, convert, streamline.

SMED study of a press brake in AVIA: current time 52 minutes, target 25, achieved 26, before and after chart, internal and external operations
Lean Management menu, SMED tab: a tool changeover study on a press brake. The current, target and achieved times, the before / after chart and the changeover operations.Capture of the AVIA portal on a fictitious demonstration company (local test bench): names, figures and dates are sample data. View full size

The heart of the method is the operations table. Each operation has a type — internal (machine stopped) or external (can be done while the machine runs) — and a duration, then an “improved” type and duration, or “eliminated” if the operation disappears. Below the chart, a “calculated from the operations” block gives the internal time before and after, the time eliminated and the total gain; it is read-only and is not copied back into the study. On the screenshot, the first operation (looking for tools) becomes external: it is now prepared while the machine runs.

4. Carry the kaizen: a project and its A3 sheet

The Projects tab accepts the types Kaizen, A3, PDCA, Six Sigma (DMAIC), Lean, SMED, Quality and Safety. The project carries a quantified objective (current value, target value, unit), a deadline, an estimated gain, then an actual gain; the list filters by status and by type. Expand the row of a kaizen or A3 project: the A3 sheet appears in four zones — Problem, Root cause, Countermeasure, Result.

AVIA improvement projects list, with a kaizen project expanded on its four-zone A3 sheet: Problem, Root cause, Countermeasure, Result
Lean Management menu, Projects tab: a kaizen project expanded. The A3 sheet holds the problem, its root cause, the countermeasure and the result, next to the estimated gain and the actual gain.Capture of the AVIA portal on a fictitious demonstration company (local test bench): names, figures and dates are sample data. View full size

The four zones are free text: AVIA files the approach next to the project's figures, it does not dictate it. For the same reason, the root cause is dug into elsewhere, in the non-conformity's cause analysis (successive whys, Ishikawa) — see Six Sigma in AVIA: a step-by-step DMAIC.

5. Measure OEE by workstation, in Quality › OEE/TRS dashboard

The page shows four cards — overall effectiveness, availability, performance, quality — over today, 7 or 30 days, then one line per workstation. The server calculates OEE: availability × performance × quality, from operation confirmations and machine stops. A line expands the workstation detail: good parts and scrap, actual and target cycle, opening, run and stop time, stops by cause. Further down, the trend over the last 14 days and the stops by cause over the period.

AVIA OEE / TRS page: overall effectiveness, availability, performance, quality, and a table per workstation with an 85 percent target and a laser cutting workstation on alert
Quality › OEE/TRS dashboard, over 30 days: the four indicators and the table per workstation. Laser cutting, at 84% against a target of 85%, is marked “Alert”.Capture of the AVIA portal on a fictitious demonstration company (local test bench): names, figures and dates are sample data. View full size

The target and the alert threshold are set per workstation, on the workstation record (fields “OEE target (%)” and “OEE alert threshold (%)”). Empty target: 85%. Empty threshold: it equals the target, and it must stay lower than or equal to it. A workstation below the alert threshold is marked “Alert”; between the threshold and the target, it is “Watch”. Colour is never alone: a word goes with it. On the screenshot, the laser cutting threshold was not set, hence the alert from 84%.

6. Hold the discipline: the “Excessive scrap rate” rule

Measuring is not enough: you still have to react when scrap drifts. In Settings › Business rules, the Excessive scrap rate type compares the scrap rate declared on a production or operation confirmation (scrap / (good + scrap)) with the workstation's reference scrap rate — the “Scrap rate (%)” field of its record — plus a tolerance margin in percentage points. Beyond it, the confirmation is flagged or refused depending on the mode: warn (logs and lets it through) or block (refuses the write).

One thing to know: as long as no rule of this type is saved and active, the check does not apply — filling in the workstation's reference rate is not enough. As with any rule, simulate first: the button replays the rule on the documents of the last 90 days, writing nothing.

AVIA New rule form: type Excessive scrap rate, scope the whole tenant, tolerance margin, severity warn, and the result of the 90-day simulation
Settings › Business rules: the “Excessive scrap rate” rule in warn mode, simulated over 90 days. On this demonstration data set no confirmation declares scrap: 65 documents evaluated, 0 stopped.Capture of the AVIA portal on a fictitious demonstration company (local test bench): names, figures and dates are sample data. View full size

Start in warn mode: every excess is logged and counted, without hindering the workshop. Once the team has got the habit, switch to block. The message displayed names the workstation, the observed rate and the reference, margin included.

By sector: the workshop rule packs

In Settings › Business rules, AVIA offers packs by business. A pack arrives with its rules switched off: “Simulate” quantifies what each rule would have stopped before any application, then “Apply pack” sets them, to be activated one by one. None of them is a Lean pack: they lay the foundation of a workshop.

Industrial machineryFor a workshop that assembles numbered machines, five rules in “warn” mode protect the availability and quality that OEE measures: up-to-date maintenance, inspection before confirmation, machine released by quality.Rule pack · Machine manufacturingQualification requiredInspection required when confirming an operationFinished product quality releaseTraceability requiredOverdue maintenanceERP for special machines
Precision mechanicsFor machining: a tight receipt tolerance, lower purchase approval thresholds, and an end date required as soon as a manufacturing order moves to a firm status, useful for scheduling the workshop.Rule pack · Precision mechanicsOver-receipt toleranceAmount-based approvalClosed accounting periodRequired field for a statusERP for mechanical engineering
Packs by business in AVIA: Machine manufacturing card, five rules, and the simulation result rule by rule with the number of documents evaluated and blocked
Settings › Business rules › Packs by business: the “Machine manufacturing” pack simulated. For each rule, the number of documents evaluated and of documents that would have been blocked.Capture of the AVIA portal on a fictitious demonstration company (local test bench): names, figures and dates are sample data. View full size

The “Excessive scrap rate” rule is part of none of these packs: you add it separately, as in step 6.

Summary: from the Lean tool to the AVIA screen

From the Lean tool to the AVIA screen that holds it.
Lean toolAVIA screenRule or indicatorWhat you see
5SLean Management menu, 5S tab80% compliance threshold, score of each SRadar per area, areas compliant or “Needs action”
Kaizen, idea boxLean Management menu, Suggestions tabSix-status workflow, submitter distinct from the evaluator, estimated then observed gainBoard by column, gains at the top, link to the corrective action
SMEDLean Management menu, SMED tabCurrent, target, achieved time; internal, external, eliminated operationsReduction in %, before / after chart, total gain
A3, PDCA, kaizenLean Management menu, Projects tabQuantified objective, estimated and actual gain, four A3 zonesA3 sheet expanded under the project row
OEE / TRSQuality › OEE/TRS dashboardAvailability × performance × quality; target (85% by default) and alert threshold per workstationCards, table per workstation, words “Alert” or “Watch”, trend, stops by cause
Zero defects, quality at the sourceSettings › Business rules“Excessive scrap rate” rule (workstation reference rate + margin), warn or block mode, 90-day simulationConfirmation flagged or refused, with the workstation, the observed rate and the reference
Foundation of a machine workshopBusiness rules › Packs by business“Machine manufacturing” pack (five rules, warn mode)Simulation result rule by rule, rules set switched off

What AVIA does not do for you

AVIA has no value stream mapping (VSM), no andon, no mistake-proofing (poka-yoke), no total productive maintenance (TPM) module and no screen dedicated to tracking waste: a Gemba sheet only offers a free field “Identified waste (Muda)”. A 5S audit creates no action by itself: the action plan is a free field, and the link with a corrective action is made from a suggestion. The A3 sheet and the project zones are free text. The workshop Kanban exists (a board of manufacturing orders by status, with work-in-progress limits), but not the card-based replenishment kanban, which remains a physical signal that the server does not calculate; to pull flows, an item's planning also offers decoupling buffers (DDMRP), tracked in the requirements calculation. Finally, OEE depends on the quality of your stop and confirmation entries: a correct figure requires correct entry.

Going further

The SMED method itself is detailed in SMED: what your changeovers really cost you, and the choice between Lean and Six Sigma in Lean or Six Sigma: is your problem lead time or variation?. To run a DMAIC with the same quality screens, see Six Sigma in AVIA. How rules work (scopes, modes, packs, simulation) is described in the business rules documentation and on the business rules page; the overview of the approach is on Lean Six Sigma. AVIA is designed to support a continuous improvement effort; it does not replace it.

AVIA ERP editorial team
About

Frequently asked questions

Where do I set a workstation's OEE target in AVIA?

On the workstation record, in the “OEE target (%)” and “OEE alert threshold (%)” fields. An empty target is 85%, an empty threshold equals the target, and it must stay lower than or equal to it. In the Quality › OEE/TRS dashboard, a workstation below the alert threshold is marked “Alert”, and between the threshold and the target “Watch”.

How does AVIA score a 5S audit?

An audit has twenty-five criteria, five per S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke), scored from 1 to 4; a comment is mandatory for a score of 2 or less. The score of each S and the total (the average of the five) are calculated live. From 80%, the area is “Compliant”; below, it is “Needs action”.

How do I flag or refuse excessive scrap at a workstation?

With the business rule “Excessive scrap rate” (Settings › Business rules): it compares the scrap rate of a production or operation confirmation with the workstation's reference scrap rate, plus a margin in percentage points. It works in warn mode (logs and lets it through) or block mode (refuses the write). As long as no rule of this type is active, the check does not apply; simulate first on the last 90 days.

See AVIA ERP on your own process